Sunday 9th January 2022
Vertical system
A 6 feet tower length was measured and the net pockets were made using a heat gun and glass bottle. first the pipe was measured 6" on both ends then 12" apart for each pocket. Total of 21 pockets
A "X" was marked to indicate each point then a line was drawn so a small cut could be made. using a grinder the line was sliced. where the line was sliced, heat was applied using the heat gun. once the PVC was soft then a glass bottle was inserted to create the pocket and water was used to cool the PVC.