Tuesday 11th January, 2022

 Vertical system 

-a 4" hole was drilled into the bucket. 



- holes were drilled in the drain stand.

-Attempt to make a flange to help support the system 


-a grinder was used to make the slits and the pipe was heated to get the shape. 



-

Comments

Popular posts from this blog

Thursday 16th September, 2021

Tuesday 12th April, 2021